Please join us as we build our dream home in the Melrose area of Roseburg, Oregon. Five hundred feet above the valley floor, we overlook the South Umpqua River as it flows through the vineyards of Garden Valley and unites with the North Umpqua River at River Forks Park. The Northeast view presents a tranquil experience with each amazing sunrise.
Sunrise Over Garden Valley
Wednesday, November 23, 2011
Ledgestone
October 24, 2011 - Monday
We decided to put some ledgestone on the foundation of the house, so we figured it would look good to put a little in the interior as well. We installed some ledgestone on the bar side of the kitchen island and below the jacuzzi tub.
We decided to put some ledgestone on the foundation of the house, so we figured it would look good to put a little in the interior as well. We installed some ledgestone on the bar side of the kitchen island and below the jacuzzi tub.
November 7, 2011 - Monday
Began stone work on exterior. The stone is Veneerstone (Verago) from Home Depot.
Finished all concrete and gravel work.
November 8, 2011 - Tuesday
Formed gate supports. We aren't planning on putting up a gate right away, but will put up the supports since we have enough stone.
November 9, 2011 - Wednesday
Continued stone work.
November 10, 2011 - Thursday
Continued stone work.
November 11, 2011 - Friday
Continued stone work - around the BBQ area.
November 12, 2011 - Saturday
Finished stone work. Put on Stone caps
November 23, 2011 - Wednesday
Finsihed caulking stone. Hooked up the BBQ.
I'll have to add pictures later. It's been raining and it is a muddy mess. Once I get it somewhat landscaped I will take some pictures.
WE ARE OFFICIALLY COMPLETED!!!
Electrical, Finish
We bought a majority of our electrical (lights, chandeliers, etc.) from Home Depot a few months ago. We finally get to start taking these things out of the garage and start putting them in the house. We made a couple more trips to Home Depot for whatever we didn't get in the first trip. I never thought I would by $400 worth of light bulbs in one trip, but we did just that. It's amazing how fast things add up.
All the light fixtures are oil rubbed bronze with antiqued glass. It looks amazing with the paint colors we chose. Very exciting to see all of this get installed.
August 23, 2011 - Tuesday
Installed all exterior lights. Began installing electrical outlets/switches. Began putting in light fixtures.
Ordered interior doors and trim.
August 24, 2011 - Wednesday
Installed smoke & carbon monoxide detectors. Finished lighting in the great room / loft. Put in ceiling fan in master bedroom. Installed medicine cabinets in master bath. Continued installing outlets/switches.
Had Mark, from The Floor Brokers, come up and measure for Carpet and Tile (more later on flooring).
August 25, 2011 - Thursday
Continued working on outlets/switches. Installed ceiling fan in loft and chandelier in dining room.
August 26, 2011 - Friday
Continued working on outlets/switches. Installed ceiling fan in great room and chandelier in entry.
Did some clean-up.
September 20, 2011 - Tuesday
Installed doorbell.
September 21, 2011 - Wednesday
Installed phone jacks and cable connectors.
October 20, 2011 - Thursday
Had Kevin Saylor dig a trench to run electric, sewer, and water lines out the the future pool house and play house. Installed conduit and filled in trench.
October 25, 2011 - Tueday
Labeled electrical panel.
November 23, 2011 - Wednesday
Last electrical item. The stereo in the Gym. The stereo/DVD/CD is intended to go in an RV so we have to add a transformer. It is perfect because it installs in the wall and hooks up to the TV, so I can watch DVD's, listen to CD's, or I can run the TV through the Stereo and listen to it through the ceiling speakers. The sound is pretty good! Thanks for hooking it up for me Stephanie (my cousin).
My back willing, I plan on spending as much time as I can in here.
All the light fixtures are oil rubbed bronze with antiqued glass. It looks amazing with the paint colors we chose. Very exciting to see all of this get installed.
August 23, 2011 - Tuesday
Installed all exterior lights. Began installing electrical outlets/switches. Began putting in light fixtures.
Ordered interior doors and trim.
August 24, 2011 - Wednesday
Installed smoke & carbon monoxide detectors. Finished lighting in the great room / loft. Put in ceiling fan in master bedroom. Installed medicine cabinets in master bath. Continued installing outlets/switches.
Had Mark, from The Floor Brokers, come up and measure for Carpet and Tile (more later on flooring).
August 25, 2011 - Thursday
Continued working on outlets/switches. Installed ceiling fan in loft and chandelier in dining room.
August 26, 2011 - Friday
Continued working on outlets/switches. Installed ceiling fan in great room and chandelier in entry.
Did some clean-up.
September 20, 2011 - Tuesday
Installed doorbell.
September 21, 2011 - Wednesday
Installed phone jacks and cable connectors.
October 20, 2011 - Thursday
Had Kevin Saylor dig a trench to run electric, sewer, and water lines out the the future pool house and play house. Installed conduit and filled in trench.
October 25, 2011 - Tueday
Labeled electrical panel.
November 23, 2011 - Wednesday
Last electrical item. The stereo in the Gym. The stereo/DVD/CD is intended to go in an RV so we have to add a transformer. It is perfect because it installs in the wall and hooks up to the TV, so I can watch DVD's, listen to CD's, or I can run the TV through the Stereo and listen to it through the ceiling speakers. The sound is pretty good! Thanks for hooking it up for me Stephanie (my cousin).
My back willing, I plan on spending as much time as I can in here.