June 24, 2011 - Friday
Spent over three hours going over cabinet layout. Looking forward to seeing how these are going to turn out.
September 2, 2011 - Friday
This is one of the most exciting stages. I've looked forward to getting the cabinets since we started, and the day is finally here. I've been a little nervous that the stain we picked out might be a little dark, but they turned out perfect. Not only is the color great, but Brian did an amazing job building all the cabinets. They are made entirely out of solid wood and, in my opinion, the craftsmanship is unmatched. These cabinets were worth every penny we spent.
Brian delivered the vanities and the lower portions of the cabinets and began installing. We will get the upper portions and doors at a later date. We needed the lower portions so The Marble Center could get a template for the granite countertops that will be installed in a couple weeks. Brian put in a lot of long hours to get them to us in time.
September 3, 2011 - Saturday
Finished installing vanities and lower portions of cabinets. They look amazing and the sizes are perfect. They look amazing and they are very functional.
Kitchen |
Kitchen |
Master Bath Vanity |
Kids Vanity |
October 10, 2011 - Tuesday
Brian is back with the rest of the cupboards. He spent the day installing them, the cabinet doors, and crown molding.
He also brought the counter for the utility room. The counter and utility sink were installed, along with granite backsplashes, cabinet lighting and the refrigerator.
October 12, 2011 - Wednesday
Brian continued to install cabinet doors.
October 19, 2011 - Wednesday
Attached cabinet pulls, completed utility sink install.