August 29, 2011 - Monday
Stained interior posts/beams.
Installed hardwood in dining room.
We will be using a prefinished hardwood called Acacia. It is a type of Asian Walnut. It is extremely hard and has a rich dark color. Should go great with everything else we are doing.
August 30, 2011 - Tuesday
Finished staining interior posts/beams.
Started installing Hardibacker for tile floors.
August 31, 2011 - Wednesday
Finished installing Hardibacker for tile floors.
Started installing wood floors in loft.
September 1, 2011 - Thursday
Washington Federal came down to do their monthly inspection.
Continued to install wood floors in loft and stairs. Must have been a slight miscalculation because we ran out, so we will have to order more from Lumber Liquidators.
Wood flooring is going a little slow because the wood is so hard. about every 1/15 staples doesn't quite get through the wood so it has to be pulled out and redone. It has probably increased the install time by 50%.
Not really impressed with Lumber Liquidators. I can't say I would use them again. I think you can match their pricing if you shopped around. Customer service is just, ok. They have good pricing on their wood flooring, but watch out if you need bullnose, or other edging, for stairs or exposed edges.
September 2, 2011 - Friday
Spent the morning going over tile layout.
We decided on Vallano Porcelain Tile. It has some texture to it but shouldn't be too hard to clean. We decided on three colors for the floors: 50% Dark Chocolate (VL04), 25% Caramel (VL02), and 25% Milk Chocolate (VL03). For the shower tiles we will use Macadamia (VL01), a much lighter tile.
On the floors we will have a 6" x 12" border and put the 18" x 18" center pieces at a diagnal. In the showers we will use 12" x 12" and add a couple horizontal lines of a darker 2" x 2" tile color.
We bought the tile and carpet from The Floor Brokers, (541) 673-8507. We are really impressed with them. Great customer service.
September 5, 2011 - Monday
Started tiling kitchen
September 6, 2011 - Tuesday
Continued kitchen/entry tile. Started tub/shower tile in the guest/kids bathrooms.
The Marble Center came down to measure for countertops that will be installed next Monday.
September 7, 2011 - Wednesday
Started border tile in the kitchen/entry. Continued tub/shower tile.
Kitchen Tile |
Entry Tile |
September 8, 2011 - Thursday
Completed floor tile in guest bath and 1/2 bath.
Had to make a change in the tile layout. It seems the tile sizes vary between colors. It was a little easier to hide it with the 18" x 18" tile but would look horrible with the 12" x 12" tile. Very disappointing for a product made in the USA!
1/2 bath tile |
Guest bath tile |
September 9, 2011 - Friday
Completed tile in utility/laundry room.
It was a very hot day, so we took the opportunity to make a trip to Home Depot.
September 12, 2011 - Monday
Completed tile in kids bath and master bath.
September 13, 2011 - Tuesday
Started tile in master bath shower.
September 14, 2011 - Wednesday
Finished tile in master bath shower and started working on grout.
September 15, 2011 - Thursday
Finished grout
Bruce (Rocky Road) delivered a couple loads of gravel.
September 16, 2011 - Friday
Applied sealer to tile/grout.
This completes almost all the wood and tile floors. We have a few misc things to do when we get the rest of the wood floors and a little tile after we install the base trim.
We will be getting carpet in about a month (one of the last things).
September 20, 2011 - Tuesday
Grout tile flooring.
September 21, 2011 - Wednesday
Tile caulking.
September 28, 2011 - Wednesday
Installed interlocking rubber floors in gym.
October 3, 2011 - Monday
Clean-up so The Floor Brokers can install carpet.
October 4, 2011 - Tuesday
Completed pad installation. Started carpet install.
October 5, 2011 - Wednesday
Completed Carpet installation.
October 27, 2011 - Thursday
Put a final coat of sealer/enhancer on the floor tile.